For your next stage
Space for the work ahead.
List the main materials and when each stage should finish. Bricks, concrete and soil need an agreed weight limit; a larger container does not guarantee suitability for a heavy load.
- Materials discussed before hire
- Heavy-load suitability checked
- Delivery and collection coordinated with the job

From plan to collection
Three steps. One clear plan.
We settle the practical details before a skip is delivered.
- 1
Tell us about the load
Choose a starting size and describe the materials, postcode and planned position.
- 2
Agree the arrangement
A real operator checks access, any permit, the hire period and the total quote.
- 3
Fill, then arrange collection
Keep to the agreed material and loading limits. Collection is confirmed with the operator.
Before the skip arrives
A few things to check.
Sizes, placement and materials, explained before you request a quote.
01Can I fill a large skip with rubble?
Do not assume a larger skip can take a full heavy load. Tell us about bricks, concrete or soil so the appropriate size and weight limit can be confirmed.
02Can plasterboard go in?
Our sample policy requires plasterboard to be discussed separately before hire. Do not mix it into an agreed general load.
A few practical details
Start with your project.
Choose what you know. Leave the final size and delivery plan for a conversation.
Your demo outline is complete.
No enquiry was sent. Nothing was stored or reserved.
A real operator would discuss the materials, access, hire period and total quote before confirming a delivery.